Project Managers

We are experts in Project Management with long-term extensive experience gained by working on challenging complex projects like:
  • Biomass-to-Energy (since 2006)
  • Waste-to-Energy (since 1990)
  • Plant optimisation (since 2010)

Hands-on Services

We work as dedicated single experts or as Project Team to provide hands-on services on worldwide projects from initial studies to plant handover:
  • Technical concepts
  • Feasibility studies
  • Technical specifications
  • Tender evaluation and negotiation
  • Check of Contractor´s works
  • Plant optimisation

We work in teams

Cooperation with Dutch RG-Projecten bv allows handling of bigger projects, like:
  • Alkmaar 4th line
  • BEC Twence
  • Dordrecht 5th line
are examples of our successful partnership.
We involve further experts from our network as necessary for the project.

Our Reference Projects

We are trusted by

  • Vattenfall, Sweden
  • SUEZ, Netherlands
  • SITA, Belgium
  • Nuon, Netherlands
  • RG-Projecten bv, Netherlands
  • Tebodin (Bilfinger), Netherlands
  • Steinmüller Engineering, Germany
  • Electrowatt (Pöyry), Germany
  • and more

Excellent ratings

  • "Based on the good experience from this 4th line project, we also involved him in our Dordrecht 5th line project."
  • "I am fully satisfied with his work, glad for having him had in my team and would like to see him back in one of my next projects."
  • "For boiler and turbine he proposed technical optimisations, which we will apply."
  • and more

Technical Specifications

We prepared the technical part of contractual specifications for the following projects:

  • Carpe Power, 30 MW el., modification of Carpe to CHP plant
  • Carpe Futurum, 100 MW Biomass (wood)
  • HVC conversion from peat to pellets, 132 MW     
  • Groene Weide, 87 MW Biomass
  • Dordrecht 5th line, 75 MW municipal waste

Back to Projects Top of Page

Energy Studies

01/2013 - 06/2020, Carpe Futurum Power Generation, Uppsala, Sweden

Client: Vattenfall

B-P works: Buchhorn-Projects set up the concept and calculated the water/steam circuit to optimise process parameters of the new 100 MW BtE plant, allowing for later modification from heant-only to CHP plant. Finally, Buchhorn-Projects  prepared the technical part of the ITT for the future extension of Carpe by a turbine.

06/2011 - 09/2019, Baviro, Roosendaal, Netherlands

Client: Sita ReEnergy / RG-Projecten bv

B-P works: Studies as listed below to optimise heat extractions

02/2019 - 09/2019   Feasibility study: Supply of district heating.

05/2015 - 06/2015   Update of cycle calculation.

03/2015                   Feasibility study: Biogas application.

06/2011 - 08/2012   Excel based modelling of the thermal cycle to

                                optimise heat extraction to district heating.

06/2010 - 06/2011, Doel (Antwerp), Belgium

Plant: SLECO

Client: SITA Belgium

B-P works: Consultancy and study works, concept for optimisation of thermal cycle.

Back to Projects Top of Page

Biomass-to-Energy

01/2013 - 08/2022, Carpe Futurum, Uppsala, Sweden

Client: Vattenfall

Fuel: Recycled wood chips mixture, 100 MW

B-P works: Process Engineer, Basic design package, technical specifications, technical tender evaluation and negotiation, control of Contractor´s engineering, support of commissioning, check on guaranteed performances.

03/2016 - 12/2019, HVC, Uppsala, Sweden

Conversion of existing HVC from peat to pellets

Client: Vattenfall

Fuel: Wood pellets and bio oil, 132 MW by 4 out of 5 burners

B-P works: Process engineering, technical specifications, technical tender evaluation and negotiation, review of Contractor´s design, general support to Vattenfall.

04/2012 - 09/2014, Groene Weide, Utrecht, Netherlands

Client: NUON / RG-Projecten bv

Fuel: Biomass, 87 MW

B-P works: Project Manager Incineration & BoilerConceptual design, technical specifications for incineration and boiler, Tender evaluation. The "Groene Weide"  has not been realised as Nuon sold plant and project.

11/2005 - 08/2008, BEC Twence, Hengelo, Netherlands

Client: Twence / Tebodin

Fuel: 20 t/h Dutch B-wood (German A3), 73 MW

Steam: 80 t/h, 68 bar, 465°C

Electricity: 20.4 MW ( efficiency: > 27%)

B-P works: As Project Manager process responsibility for the whole process. Control of Contractors works, coordination of commissioning, trial run and acceptance tests.

Back to Projects Top of Page

Waste-to-Energy

08/2011 - 10/2011, 1st maintenance stop of 5th line, Dordrecht, Netherlands

Client: NV Huisvuilcentrale / RG-Projecten bv

B-P works: Stop Manager, responsible for the team (6 experts), planning, costs and quality. Time to organise was 7 weeks and stop lasted 6 weeks. 42 Contractors and 394 persons involved, 1579 h/d peak workload, zero accidents.

2/2006 - 08/2011, 5th line, Dordrecht, Netherlands

Client: NV Huisvuilcentrale / RG-Projecten bv

Fuel: 30 t/h MSW, 75 MW

B-P works: As Project Manager Process responsibility for main process. Technical concept, heat & mass balances, cost estimate, contributions to environmental permit, technical specifications, tender evaluation and negotiation, control of Contractor´s works, coordination of commissioning, trial run and tests.

07/2005 - 08/2005, MRIP, Macau Refuse Incineration Plant

Client: CGS Macau Tratamento de Residuos Lda

Fuel: 12 t/h MSW per line (3 lines)

B-P works: Replacement of a local Engineer. Draft technical sections of the RfQ, participation in negotiations with the supplier Mitsubishi

02/2005 - 06/2005, Nangong, Beijing, China

Client: City of Beijing / KfW

Place of work: Beijing

B-P works: During the initial phase of the project, advice to KfW (German Development Bank) and support to Administration of Beijing to finalise Feasibility Study, Environmental Impact Assessment and Terms of Reference for the Implementation Consultant. The 1000 t/d plant Nangong went in operation in 2017.

10/2002 - 01/2005, 4th line, Alkmaar, Netherlands

Client: NV Huisvuilcentrale

Fuel: 27 t/h MSW, 75 MW

As Project Manager Process Mr. Buchhorn controlled Contractor´s works to ensure the process being in line with the contract, check of costs, planning, quality, coordination with ongoing operation, control of commissioning, trial run, tests and project handover.

1999 - 09/2002, BOOT Naples & Campania, Italy

7 pre-treatment & composting and  2 incineration plants

Total capacity: 2,500,000 tons MSW / year.

At BBP Environment (today Steinmüller Babcock Environment GmbH) Mr. Buchhorn was Head of Technology Project Development (BOOT) and became Owner´s Engineer. Picture of Acerra by friendly permission of Steinmüller Babcock Environment GmbH.

1990 - 1999, Project Manager Waste-to-Energy

At L.& C. Steinmüller GmbH Mr. Buchhorn was Project Manager in the department Project & Sales Waste-to-Energy. Most projects were turn-key plants. As from 1994 he was deputy head of the department.

Back to Projects Top of Page

Flue Gas Cleaning, Instructor

04/2010 - 06/2018, DeNOx, Alkmaar & Dordrecht, Netherlands

Client: NV Huisvuilcentrale / RG-Projecten bv

B-P works: DeNOx modification studies as follows:

05/2018 - 06/2018      Reduction of SCR gas consume.

02/2011 - 03/2011       Minimisation of gas consume

04/2010 - 11/2010      Transformation from SCR to SNCR.

03/2010 + 08/2010, SCR Training, Johannesburg, South Africa

Client: ESCOM / Steinmüller Engineering

B-P works: SCR Training to new environmental  department, developing a case study for 6 x 600 MW Majuba Power Station, definition of process data, calculation of main data and development of a draft layout.

12/2009 - 04/2010, ZAVIN,  Dordrecht, Netherlands

Client: ZAVIN / RG-Projecten bv

B-P works: SCR of the clinical waste incineration plant was optimised. We provided consultancy and support during Trial Run and start of commercial operation.

04/2008, SCR Training, Guiyang, China

Client: Steinmüller Engineering

B-P works: Instructor during SCR training session held by Steinmüller Engineering in China for the Jinyuan Groep.

07/2005 - 09/2006, DeNOx, Gummersbach, Germany

Client: Steinmüller Engineering

B-P works: Support to SE developing their DeNOx activities. Collection and summary of present know-how about SCR process. Software tool to calculate SCR reactor catalyst volume and outline of a standard design handbook.

1984 - 1989, Project Engineer DeNOx

At L.& C. Steinmüller GmbH Mr. Buchhorn was Project Engineer for SCR and SNCR applications in the DeNOx Projects & Sales department.

Back to Projects Top of Page